The Delhi Metro Project
Life Republic Residence
Lupin Limited
Delhi Airport Metro Express Limited
Indo-Pak Border ICP Attari
Indo-Nepal Border ICP Jogbani and Raxaul
Tech Mahindra
International Convention Centre, Pune
HDFC Bank
Surveillance
CCTV Analog / IP Based Surveillance Systems
Fire Detection Systems
Fire Alarm
Conventional / Addressable Fire Alarms
Aspiration type detection systems
Fire Suppression
Fire Fighting
Wet Riser Hydrant and Sprinkler
Dry Riser Sprinkler Systems
Voice Evacuation
Public Address
Digital / Analog Public Address systems
Integrated PA with Fire Alarm System
Automation
Building Management Automation & Integration of various services with a central monitoring facility
Access Control / Crowd Management
Access Control Card/Biometric/Smart access control
MEP
Plumbing
Plumbing & Water Supply System / Hydropneumatic System
Perimeter Control
High security fencing Fully monitored and supervised fencing systems
Gaseous Fire Suppression
Clean Agent Systems Gas based flooding (NOVEC1230 / FM200) based fire suppression system
Industrial Security
Integrated solutions tailor-made to fit the requirements of the factories and industrial units
Residential Security
Everything from townships to individual bungalows maintaining the highest quality of safety
Corporate Security
Safety Security & Surveillance services to ensure state of the art protection for mega projects
Infrastructure Security
Safety Security & Surveillance services to ensure state of the art protection for mega projects
Our Services
Surveillance
CCTV Analog / IP Based Surveillance Systems
Fire Detection Systems
Fire Alarm
Conventional / Addressable Fire Alarms
Aspiration type detection systems
Fire Suppression
Fire Fighting
Wet Riser Hydrant and Sprinkler
Dry Riser Sprinkler Systems
Voice Evacuation
Public Address
Digital / Analog Public Address systems
Integrated PA with Fire Alarm System
Automation
Building Management Automation & Integration of various services with a central monitoring facility
Access Control / Crowd Management
Access Control Card/Biometric/Smart access control
MEP
Plumbing
Plumbing & Water Supply System / Hydropneumatic System
Perimeter Control
High security fencing Fully monitored and supervised fencing systems
Gaseous Fire Suppression
Clean Agent Systems Gas based flooding (NOVEC1230 / FM200) based fire suppression system
